December 2016 construction update
As temperatures drop and winter sets in, crews are bundling up to continue the extensive masonry work Union Terminal needs. If the exterior of the building looks a little brighter it’s the result of the application of a non-acidic liquid cleaner to remove grime and biological growth from the limestone
Recent Comments